Road system
+ The industrial park is located between National Highway 5A and Hanoi - Hai Phong Expressway.
+ The road system in the IP is planned in a grid layout with high load capacity to ensure convenient access to each plot of land.
* Main roads: 32 m (4 lanes).
* Other internal roads: 23 m (2 lanes).
Power supply
+ The 110kV transmission line from Pha Lai thermal power plant and Thuy Nguyen Hai Phong thermal power plant.
+ The 22kV transformer station for the entire industrial zone with the capacity of 80 MVA connects to each land lot.
Telecommunication infrastructure
The modern communication information system is provided by leading telecommunications companies such as VNPT, EVN-telecom, Viettel Telecom, etc.; with a dedicated FTTH fiber optic network and ADSL covering the entire industrial zone.
Water supply system
Water is supplied by Vat Cach water plant (Hai Phong) with a capacity of 20,000m3/day and night and is currently being upgraded to 30,000m3/day and night.
Drainage and wastewater treatment system
Factory standards: wastewater treatment system meets column A standards. Maximum treatment capacity: 12,000m3/day and night; Current wastewater treatment capacity: 8,000m3/day and night.
Fire fighting and prevention system
Available Fire protection system with specialized equipment and professionally trained fire protection team.
Services and amenities
+ The Customs office provides services related to customs procedures, transportation, warehousing, and storage facilities to facilitate the import and export of goods for businesses in Trang Due Industrial Park.
+ Available banks such as Vietinbank, Shinhan bank, Worri bank in the Industrial Park
+ Security team and fire prevention team on duty 24/7