Road system
- The IP is located near key national routes such as National Highway 1A, National Highway 30, National Highway 50, National Highway N2, the Truong Long - My Thuan expressway, the My Thuan – Can Tho expressway, and Ring Road 4 connecting six key provinces in the South.
- Main roads: 40m wide, 6 lanes.
- Branch roads: 23m wide.
Power supply
- The power supply system draws electricity from the national grid through a 110/22kV transformer station.
- Transformer station capacity: Phuoc Vinh Dong 1 Industrial Park (9.3 MVA), Phuoc Vinh Dong 2 Industrial Park (9 MVA), Phuoc Vinh Dong 3 Industrial Park (7.4 MVA), Phuoc Vinh Dong 4 Industrial Park (9.6 MVA).
Water supply system
Clean water plant capacity:
- Phuoc Vinh Dong 1 Industrial Park: 1,600 m3/day and night.
- Phuoc Vinh Dong 2 Plant: 1,500 m3/day and night.
- Phuoc Vinh Dong 3 Industrial Park: 1,400 m3/day and night.
- Phuoc Vinh Dong 4 Industrial Park: 1,600 m3/day and night.
Wastewater treatment plant
Wastewater treatment plants in industrial clusters have a total capacity of 3,800m3/day and night.
Rainwater drainage system
A drainage system will be installed along internal roads in the area, ensuring timely collection of rainwater within the factory premises and then draining it into rivers and sea.
Telecommunication infrastructure
Modern and advanced information technology infrastructure with high-quality transmission ensures seamless communication and data security.
Services and amenities
- Banking systems such as Agribank, Vietcombank, Vietinbank, etc. operate around the industrial park.
- Local clinics and hospitals are ready to serve staff and workers in the area.