Road system
+ The IP is adjacent to the new national route 1A
+ The road system in the IP is planned in a grid layout with high load capacity to ensure convenient access to each plot of land.
* Main roads: 32 m (4 lanes).
* Other internal roads: 23 m (2 lanes).
Power supply
110/22 KV substations of Quang Chau 1 and 2, with a total capacity of 315 MVA, ensuring stable and sufficient power supply to each factory.
Telecommunication infrastructure
Modern and advanced information technology infrastructure with high-quality transmission ensures seamless communication and data security.
Water supply system
The clean water source for the Industrial Park is supplied by the Quang Chau Industrial Park Clean Water Plant (Bac Giang) with a total current design capacity of 27,000 m3/day and night and other backup sources.
Drainage and wastewater treatment system
After being pre-treated, the wastewater from the Industrial Park will be collected and centrally treated at the Quang Chau Industrial Park Wastewater Treatment Plant with a total designed capacity of 26,000 m3/day. The wastewater after treatment of the Wastewater Treatment Plant meets the Column A standard, QCVN 40:2011/BTNMT - National technical regulation on industrial wastewater.
Fire prevention and fighting system
The available fire prevention and fighting system, along with specialized equipment and a professionally trained firefighting team. Modern firefighting equipment meets national standards and is installed along internal roads at a distance of 150 meters per hydrant.
Services and amenities
+ The Vietcombank branch is located near the industrial park, and the ATM systems of various banks are arranged within the industrial park.
+ The security team and the fire prevention and fighting team are on duty 24/24.
+ The security camera system is installed in the industrial park.